Think he is asking what are they using to form floor,probably metal,like in high-rises.


How thick is the first/second floor going to be poured and will there be wire mesh in it?
Any tubing in the slab to run heat through? Nothing like a warm floor on a cold day.
Thats a heck of a lot of set-up for the slab. I take it they will be doing a 6"or 12" grid of rebar?


Looks great! Is it going to be a four car garage?
2 car garage up and 2 down, with the area under the upstairs garage to be used as a future wood working shop.