Master B/R makeover

   / Master B/R makeover
  • Thread Starter
#31  
The front room after floor, daybed & some decorations
 

Attachments

  • 415818-26.JPG
    415818-26.JPG
    83.6 KB · Views: 111
   / Master B/R makeover
  • Thread Starter
#32  
Finished view. NOW we (she) gets to start decorating as all the heavy stuff is done.
 

Attachments

  • 415820-27.JPG
    415820-27.JPG
    66.3 KB · Views: 123
   / Master B/R makeover #33  
looks really great.. lot's of work to complete that project..
 
   / Master B/R makeover
  • Thread Starter
#34  
Thank you... and yes, it really was a lot of work. Then again, bro in law built shell and other than drywall installation & kitchen cabinets, we've done 100% of the rest, including sealing (tar) the entire backside of house that was under grade. Flooring, trim, fixtures, fans, pond, rock retaining walls, waterfall, flagstone patios/sidewalks, doors, insulation, phone wiring & now columns & windows /forums/images/graemlins/grin.gif

So, we've done a lot of work overall.

I personally sanded the entire exterior with a 5" sander prior to staining it. Wore my little fingers out /forums/images/graemlins/tongue.gif
 
   / Master B/R makeover #35  
we've been toying with an idea to swap the walk in closet and M/B room. This, would put the bath on two outside corners and the closet with only one out side wall. Would take a lot in configuring the plumbing and electrical, the rest wouldn't bother me too much..
 

Tractor & Equipment Auctions

20FT X 30FT STEEL CARPORT (A58214)
20FT X 30FT STEEL...
Informational Lot - Financing (A56438)
Informational Lot...
Ingersoll Rand SD-116DX TF (A53317)
Ingersoll Rand...
TAYLOR WAY 962 48" HYD TILLER (A57192)
TAYLOR WAY 962 48"...
Bogballe L20W Plus (A53317)
Bogballe L20W Plus...
2020 MACK P164T (A58214)
2020 MACK P164T...
 
Top