Leveling land

   / Leveling land #1  

future_vision

Gold Member
Joined
Jun 15, 2022
Messages
370
Location
New England
Tractor
DK6010SE HSA
I'm working on a new home build which is on a slope. It's going to have a walkout basement so part of the slope is taking care of but the rest I need to backfill. Trying to figure out what is the best approach to do this. Do I need to remove the organic material off the top before adding in fill or do I just add fill on top?
 
   / Leveling land #2  
The problem with organic material is that it will shrink unevenly in the future.

Do you wish to minimize cracking of your foundation and sheetrock?

Fill will also need to be compacted.
 
   / Leveling land #3  
Can you post picture?
 
   / Leveling land #4  
Organic matter is not allowed in engineered fill. Fill must be reasonably wet and compacted in short lifts to insure uniform density.
 
   / Leveling land #5  
Remove organic stuff down to native dirt. Water well to be sure it's settled. Use 5/8" minus as a fill then water and compact that.
 
   / Leveling land #6  
+1 to what Roadworthy said. Additionally, topsoil is a precious thing and should always be scraped off first, to be used later.
 
   / Leveling land #7  
Are you referring to filling under your footers and foundation (under the house) or outside the foundation after the walkout basement is complete to landscape the yard to the foundation?
 
   / Leveling land #8  
Are you referring to filling under your footers and foundation (under the house) or outside the foundation after the walkout basement is complete to landscape the yard to the foundation?
Rock/gravel (compacted) under concrete. Clay/fill outside the foundation is okay. Topsoil goes back on top, last. IMHO
 
   / Leveling land
  • Thread Starter
#9  
Are you referring to filling under your footers and foundation (under the house) or outside the foundation after the walkout basement is complete to landscape the yard to the foundation?
Outside of the foundation. For example, in front of where the house will be we would like a flat front yard. At the moment it's slopes. I'd say between 15-30 degrees. Ill have to measure it to be sure. Should the organic material be scrapped off and then filled and compacted with clean backfill before putting the loam back on top?
 
   / Leveling land #10  
You should be good to backfill directly over the biomass...assume it's likely grass or mixed weeds you are covering with dirt to then seed your lawn.
 

Tractor & Equipment Auctions

71058 (A49346)
71058 (A49346)
2017 FREIGHTLINER M2 BOX TRUCK (A51222)
2017 FREIGHTLINER...
2018 CATERPILLAR 320GC EXCAVATOR (A51242)
2018 CATERPILLAR...
2011 FORD F-450 (A50854)
2011 FORD F-450...
2008 24ft. Haulmark Edge T/A Enclosed Trailer (A49461)
2008 24ft...
2015 JEEP PATRIOT (A51406)
2015 JEEP PATRIOT...
 
Top