Thanks JPM.  Obviously, you've already got one!  Any specific tips for running one off a Mahindra 4110 other than the general tips & lessons learned already posted here? 
 
Mine is going to a depot rather than coming directly here to the house.  Assuming I can get my equipment trailer out of my driveway by the 18th (
they are rebuilding... more like destroying... my street and it is currently "trapped"), it will be loaded onto my equipment trailer with a forklift at the depot.  I'll just need to get it off the equipment trailer and into the driveway where I can uncrate it and assemble it.  Seems that the FEL should be able to handle 900 pounds or so of crated Chinese 
chipper... yes? 

  If too awkward, I can uncrate it right on the 20-ft equipment trailer and take it off in pieces. 
 
 
Dougster