Good Morning
73° humid, going to middle 80’s with a chance of thunderstorms this afternoon.
Last nights storms brought us just about 2” of rain as the fronts passed through.
I did get all the plumbing and conduits finished, only had to dig up and move one conduit. I measured everything at least twice, but had the conduit too close to the edge of the island cabinets to be comfortable. Good thing I measured it a third time.
View attachment 874083
View attachment 874084
View attachment 874085
Tomorrow it all gets tested, then cover it all up and grade the stone for the CreatHeat installation next week.
I had to take the string trimmer down to the street and clear the sightlines for exiting my driveway. I had to go at least 100’ in either direction. I’m impressed with the Makita cordless trimmer, didn’t even use 50% of a battery using .095 Echo black diamond line on waist high weeds.
Today I’ve got to do some equipment maintenance, the progressive mower needs to be greased, I need to change the water in the plasma table and clean the water pan, and a host of other things that have been pushed back by the construction. And it’s trash night.