Everything Attachments

Status
Not open for further replies.
/ Everything Attachments #892  
Awesome! :thumbsup: Where's the pics?
Travis
As you wish. Hosed down after first introduced to cutting grass in gumbo mud. 20170413_072543.jpg
 
/ Everything Attachments #894  
I love this thing!!! :thumbsup:

DSC00857_zpsiqwejdkl.jpg
 
/ Everything Attachments #898  
Interested in a W.R. Long tooth bar for my H180 loader bucket. Long's website gives a 4 week lead time for their attachment, is this realistic? Faster? Slower?

John
 
/ Everything Attachments #899  
Interested in a W.R. Long tooth bar for my H180 loader bucket. Long's website gives a 4 week lead time for their attachment, is this realistic? Faster? Slower?

John

They're usually around 2 weeks out for tooth bars. Other attachments...buckets, QA adapters, etc. is 4 weeks like clockwork!

You'll find them here on our website: Tractor Bucket Bolt on Tooth Bar

Free shipping to your home within 1,000 miles of Newton, NC.
Travis
 
/ Everything Attachments #900  
Thanks Travis! They drop-shipped from Long I assume since they are made to a specific width?

John
 
Status
Not open for further replies.
 

Marketplace Items

2025 14ft. Bi-Parting Driveway Gate (A59231)
2025 14ft...
40' High Cube Multi-Door Shipping Container (A60463)
40' High Cube...
500 BBL FRAC TANK (A58214)
500 BBL FRAC TANK...
2007 FREIGHTLINER M2 106 4X2 26FT BOX TRUCK (A59906)
2007 FREIGHTLINER...
1996 Dorsey Enclosed Trailer, VIN # 1DTV11520TA252324 (A57453)
1996 Dorsey...
2018 Freightliner M2 106 AWD Altec AA55 56ft. Insulated Material Handling Bucket Truck (A60460)
2018 Freightliner...
 
Top