Grading Dirt Work

/ Dirt Work
  • Thread Starter
#31  
I very big thank you to all the input on this. I talked with a contractor friend of mine. He came out and shot some elevations on the pad site. He told me we will need to remove about 5 feet of dirt front the back section of the pad and add 2 feet to the front. We are going to be a tag team, I am going to clear the area of light brush and debris left around. Then he is going to loosen up the dirt with his excavator while I move it. He will use his track dozier to finish grade the area and move the 3 ton rock at the edge of the pad. I was not going to move it but since he is digging down so much we got to move it. Thanks again for all your help!!!!
 
/ Dirt Work #33  
I've only done some minor grading with my 45 hp Massey with no FEL. What has worked for me is to use my 5 ft. tiller to loosen up about 6" of top soil then move it with my blade. Then repeat the process as necessary.
 
/ Dirt Work
  • Thread Starter
#34  
Hi All,

An update, I got a box blade from Tractor Supply 6' and I love it was able to do about 85% of the grading with it and my FEL. I was able to do so much that my contractor knocked $500 off the price to do the finish grading! I love this blade it is built like a tank! Now the building is up and I got some place to work on my tractor! Thank again to all for all your advise!!
 

Marketplace Items

2012 International Prostar (A61307)
2012 International...
2016 Freightliner M2 106 Ambulance (A59230)
2016 Freightliner...
2023 Chevrolet Tahoe FL SUV (A59231)
2023 Chevrolet...
2017 Caterpillar 249D Compact Track Loader Skid Steer (A59228)
2017 Caterpillar...
2011 Chevrolet Impala Sedan (A59231)
2011 Chevrolet...
2023 MADJAX GENESIS 300 ELECTRIC CART (A57192)
2023 MADJAX...
 
Top