Approximately how long to brushhog 35 acres with 65hp tractor and 7’ cutter? Guesstimate.
 
   / Brushogging #3  
Somewhere around 10 hours, at 4mph. That's assuming full 7 foot cut every pass, no doubling back, no over lap, no BSing around. Now, if you can pull off 4.5 mpg average, it will be a bit faster.

I think 4mph is a pretty good number for a field, but if there are obstacles, heavier brush, ect, it could very well be 3 mph, or 14 hours.
 
   / Brushogging #4  
Somewhere around 10 hours, at 4mph. That's assuming full 7 foot cut every pass, no doubling back, no over lap, no BSing around. Now, if you can pull off 4.5 mpg average, it will be a bit faster.

I think 4mph is a pretty good number for a field, but if there are obstacles, heavier brush, ect, it could very well be 3 mph, or 14 hours.
4mph would be too fast for me. I do about 35 in 3 6 hour days. I have 75Hp with 8’ cutter. Impossible to not have overlap and turns etc. This is brush cutting not finish mowing.
 
   / Brushogging
  • Thread Starter
#5  
Somewhere around 10 hours, at 4mph. That's assuming full 7 foot cut every pass, no doubling back, no over lap, no BSing around. Now, if you can pull off 4.5 mpg average, it will be a bit faster.

I think 4mph is a pretty good number for a field, but if there are obstacles, heavier brush, ect, it could very well be 3 mph, or 14 hours.
Kinda what I was thinkin. 12 -15 hrs. Just gitting other opinions. Thanks.
 
   / Brushogging #6  
Somewhere around 10 hours, at 4mph. That's assuming full 7 foot cut every pass, no doubling back, no over lap, no BSing around. Now, if you can pull off 4.5 mpg average, it will be a bit faster.

I think 4mph is a pretty good number for a field, but if there are obstacles, heavier brush, ect, it could very well be 3 mph, or 14 hours.

At 4 mph, and a full 7 ft cut with a field 7 ft wide by 41.26 miles long, it would take 10.34 hours.
 
   / Brushogging #7  
One thing that we can't speak to, is your unproductive time. That's turning, lining up your passes, stopping to 'water the grass', ect; and it adds up more than people think, especially on anything odd shaped.

I would throw a guess out there, that maybe your 85% efficient; so if you are bidding this for someone else; I would use the 14.38 hours at 85% efficient; I get 16.91 hours total job.
 
Last edited:
   / Brushogging #9  
If you are mowing a unknow field, you may want to double the hours mentioned above in order to have time to react to possible hidden objects. Ken Sweet
 
   / Brushogging #10  
is this for hire or your own? i'm always skeptical of unknown fields, esp hardware w/loaded rear tires.
 

Tractor & Equipment Auctions

2000 INTERNATIONAL 9200 (A52472)
2000 INTERNATIONAL...
2009 Freightliner M2 106 MedTec Ambulance (A51692)
2009 Freightliner...
2000 Thomas Built Saf-T-Liner MVP-ER Transit Passenger Bus (A51692)
2000 Thomas Built...
2015 RAM 5500 Bucket Truck w/ Versalift SST40 boom -Cummins Diesel - Auto Trans- 4X4 - 72096 miles (A52748)
2015 RAM 5500...
(10) 2 PLUG VALVES (A52472)
(10) 2 PLUG VALVES...
2016 FORD F450 CREW CAB SERVICE TRUCK (A52576)
2016 FORD F450...
 
Top