Brush Hog Work Rate

/ Brush Hog Work Rate #21  
Thats about a 11 hour job just to let you know.
 
/ Brush Hog Work Rate #22  
Thats about a 11 hour job just to let you know.
 
/ Brush Hog Work Rate #23  
Randy, Thats about right for this area. I did alot of brushhogging in the Stilwell area about 10 years ago for 35.00/hr. I am near Sallisaw now and I get 45 to brushhog and 65 for backhoe with a 2hr. minimum. Bhh
 
/ Brush Hog Work Rate #24  
Randy, Thats about right for this area. I did alot of brushhogging in the Stilwell area about 10 years ago for 35.00/hr. I am near Sallisaw now and I get 45 to brushhog and 65 for backhoe with a 2hr. minimum. Bhh
 

Marketplace Items

John Deere 5090GN (A60462)
John Deere 5090GN...
HEIN-WERNER 57 SERIES 2 BUMPER JACK (A63569)
HEIN-WERNER 57...
Caterpillar TL1055D (A62177)
Caterpillar...
2001 PETERBILT 378(INOPERABLE) (A63569)
2001 PETERBILT...
2004 VOLVO  L50D WHEEL LOADER (A63569)
2004 VOLVO L50D...
Electric Tricycle (A64194)
Electric Tricycle...
 
Top