Basement Sub-Floor Using Sleepers - Need Some Pointers

   / Basement Sub-Floor Using Sleepers - Need Some Pointers #21  
Thanks. Interesting you put the plastic over the PT sleepers. That would avoid penetrations, just not sure what the long term result would be for the PT in my case given the high evaporation rate now.

check the specs of the mfg of the PT. Most PT is/was rated for 40 years of ground contact. I suspect it would be more in this situation, with no bugs, etc.

I know mine will last longer than me.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers #23  
that whole article is about putting flooring directly on the concrete and has good advise.

But using the method I used limits wood contact on the concrete to just the PT sleepers. In my case there was only an occasional moisture issue on the floor. I would never put wood in any area that was prone to actual surface water.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers #24  
You may have misconstrued the article. It is not about putting wood flooring on a standing wet floor. If you have that going on, you have no business putting wood down at all, no matter what you do, until you fix the water problem (if possible). It is about the nature of concrete - it is porous, loves water, and will transport it long distances in amounts that will ruin wood (but not necessarily be visually noticeable otherwise). I would never recommend putting a wood floor over a slab that has had "occasional water issues". That is seriously asking for trouble. If you have that level of water trouble, the wood is not going to hold up as the wet concrete will create a high humidity environment below the wood - in contact or not. If you did this, and it has held up, you got lucky or conditions changed to keep the slab dry.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers #25  
I have to agree with the posters who advise against trapping the moisture between the concrete and your new construction. You are asking for trouble. Mold ,mildew, no matter what your solution is against these problems the moisture problem will always be there. If you cannot stop your concrete from holding moisture you should find another flooring solution.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers #26  
If i had to do what you want to do. Cover a slab with plywood. Not something i would like to do. Here is what i would do. #1 make sure no wood ever comes into contact with the slab or your foundation walls. No sleepers. No plastic. Lay down a layer of 2" T&G rigid foam over your slab. Tape all of your seams. Install your plywood over the rigid foam screw down plywood with tapcon screws.The foam will act as a brake not allowing your plywood to wick moisture out of your slab,provide insulation and help with leveling. Use floor leveler only in spots that really need it. Good luck. Also make sure you clean your slab very well not leaving behind any organic matter before installing your foam.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers
  • Thread Starter
#27  
Well, haven't posted back in a while since I've been going round and round on how to approach this. I corresponded with one of the floor leveling mfg's and was told, as expected, that I'd have to grind off the remaining epoxy paint, then put down a latex sealer/binder before using the leveler product. As an experiement, I bought a 4" concrete grinding wheel and tried grinding off some of the high spots/epoxy paint. It actually went fast, but wow, what a dust storm. Looked into renting a walk behind type grinder, but that was going to run around $250 for a day since you have to buy $155 worth of grinding wheels on top of the $80 rental fee. I guess they don't rent the consumables with the machine. So, grinding is out given the cost plus all the dust. I have my shop on the other side of the basement which I"m not putting a subfloor in, plus there's a lot of "stuff" down there still that would all get caked with cement dust.

So, I was going to just put down plastic and then 1x4 sleepers, level the sleepers using shims, put rigid foam in between the sleepers, then 3/4" T&G OSB subflooring. I am using pocket holes to screw all the sleepers together to make a monolithic frame with the hope that I won't have to Tapcon or Ramset the wood into the concrete in too many areas. I also hammer drilled out the high spots around my lolly columns and one/two other spots that were just way high. That was the plan until yesterday when I just wasn't feeling comfortable using the plastic to cover what will slowly become damp concrete.

So, I had looked at a product called Platon but wasn't going to use it. Changed my mind yesterday and quickly ordered 700 SF from Menards since no one sells it locally. Should be here mid next week. Platon has a dimpled side which goes down against the concrete floor to let it breath. The dehumidifier should pull out any moisture that accumulates under the membrane. In the mean time, I'm proceeding to "frame out" the floor and will mark each piece and remove it to put down the Platon once I receive it. Plus, all the PT wood is damp and I need time for it to dry out. Don't want to cover it up with all that moisture in it.

Link to Platon membrane: http://www.menards.com/main/buildin...laton-flooring-protector/p-1351809-c-5710.htm

Some pic's of where it stands now. Last pic is of my shop area, which is not getting covered (thank God given all the crap over there). Again, plastic is coming up as soon as the Platon arrives.
 

Attachments

  • 20141205_134010.jpg
    20141205_134010.jpg
    619.3 KB · Views: 414
  • 20141205_134018.jpg
    20141205_134018.jpg
    548.1 KB · Views: 291
  • 20141205_134245.jpg
    20141205_134245.jpg
    801.9 KB · Views: 251
   / Basement Sub-Floor Using Sleepers - Need Some Pointers #28  
It looks like you have a ground water problem outside your foundation, it may be a good idea to have the footing drains inspected again by local contractor, they should have insight to ground water conditions in your area. You can also have a plumbing company inspect the footing drains with a camera, this will tell you if the are broken but probably not tell you if they were installed incorrectly. If the footing drains were installed just slightly too high or if they can't discharge the water your moisture problems will continue.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers
  • Thread Starter
#29  
It looks like you have a ground water problem outside your foundation, it may be a good idea to have the footing drains inspected again by local contractor, they should have insight to ground water conditions in your area. You can also have a plumbing company inspect the footing drains with a camera, this will tell you if the are broken but probably not tell you if they were installed incorrectly. If the footing drains were installed just slightly too high or if they can't discharge the water your moisture problems will continue.

Hmm, that's a thought. My issues seem to be in one corner near the door to the bilco doors. Could be some blockage there. Never get standing water there, but it does seem there's more water under the slab there than elsewhere. Not sure how the footing drains could be accessed without digging. There is an exit pipe on the far side of my driveway, but it's 50 feet from the opposite side of the house, so it would be a long snake to get to the back corner if it could be reached.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers #30  
Hmm, that's a thought. My issues seem to be in one corner near the door to the bilco doors. Could be some blockage there. Never get standing water there, but it does seem there's more water under the slab there than elsewhere. Not sure how the footing drains could be accessed without digging. There is an exit pipe on the far side of my driveway, but it's 50 feet from the opposite side of the house, so it would be a long snake to get to the back corner if it could be reached.

If you have the slope and space to work with, you could just run a new foundation drain line from that bilco door area -- on that side of the house. It probably wouldn't be a lot of digging to expose 10' of trench by the footer on each side of the bilco area, redo that section and send it into the new drain pipe.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers #31  
Pre cast bilco doors/ stairs are very difficult to waterproof, the bottom of the cement casting usually sits on top of the footing which makes it very difficult to install the footing drain properly. The 50ft footing runoff pipe if installed properly, enough pitch and no low spots, shouldn't be a problem as long as it hasn't been crushed, compromised with tree roots or animal debris. If it is possible to excavate down to the footing next to the bilco would probably be the best spot.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers
  • Thread Starter
#32  
Pre cast bilco doors/ stairs are very difficult to waterproof, the bottom of the cement casting usually sits on top of the footing which makes it very difficult to install the footing drain properly. The 50ft footing runoff pipe if installed properly, enough pitch and no low spots, shouldn't be a problem as long as it hasn't been crushed, compromised with tree roots or animal debris. If it is possible to excavate down to the footing next to the bilco would probably be the best spot.

Hard to explain but depending on how the drain was run it would require 50 feet to the house, then all the way around the perimeter, unless they put a drain pipe under my attached garage. I do know the drain pipe flows with a lot of water after a heavy rain. It might be worth excavating in the Spring around the bilco door as much as I can to see what the situation is there. Have always had some issues there. They did not backfill around the doors very well and I've filled it in as it sunk, but it seems to be stable now for 5+ years or so.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers #33  
If that PT wood is real wet, you might want to strap it while it dries out. I just completed several projects in a row with PT, and was real careful to get it nailed down quickly, or strap it down if it had to sit for a while. In the past, I would lose a lot of lumber to warping if it sat around loose while it dried out. That stuff is a PITA to deal with. Would suck if your nice flat floor framing got all wobbly.

When building our home, our builder worked with the kiln dried treated wood (KDAT) and it was awesome. So much more stable and reliable.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers #34  
I would recommend further investigation in the spring. Normally the footing drain goes around the perimeter and under the garage, against the house foundation. The work you're doing looks great and my suggestion is only to help with the humidity level.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers #35  
just catching your thread...

i would say pond liner or rather epdm roofing liner (for flat roofs) it can be had fairly cheap there is different styles of rubber/plastic out there some cheaper than others pvc, for example.. lay it down, and cut it / fold it so it comes up the walls a 1" or so. maybe a bit more until ya get your walls in. and then put down a floating tong and grove flooring. no need for any sort of shims or like, it goes down and lays right to the curvature of the concrete. and that is how it is. no need to put nails / bolts / screws down into the concrete and through the liner.

any sort of "paint on liners / water proofing" stuff for concrete *big frown* prep work prep work prep work. and again prep work. if ya goof any place, it will peel, bubble away. since your water / moisture is coming from the bottom and up through the concrete... any sort of hydraulic pressure / water pressure, is going to be push up on the paint on stuff. and i just do not see the stuff holding up long term.

6mil plastic :/ does not last, to easy with even slightest of vibrations to tear it / put a hole in it.

if you want to use tile, then just act like it was a customized DIY shower / tub. and use a little bit of tile mud, and set your tiles down into it. and forget the plastic/rubber being placed down.

if ya going to install radiant heating, easiest way IMHO (in my opionin) get yourself some hardboard insulation say 3/4" to 1" thick. using 1/2" pex piping. lay the insulation down on the floor if ya need to score it across the top/bottom so it lays a bit tighter to the floor, use some metal/foil insulation tape over the seams. and then take a router. and grove the hard board insulation out, for were you want to put the pex piping. then place your floating floor (tile or tongue and grove floor on top).

================
but before any of above...i might encourage, cutting up the floor. and installing a french drain like doing, around the perimeter of the basement (along the outside walls) and running to the sump. it is costly, but it will drain water from the soil below the floor. this is rather costly doing, but ya need to deal with that moisture issue first. give it a few years, and that moisture = mold. just trying to cover it up, may never work.

double checking.... the 2 sheds here. will sweet. more of a high temperatures / cool temperatures of morning / night time. toss a fan down and it goes away ((more of water condensing on the floor, more than anything)). certain areas are worse than others. due to how the air movement goes through the sheds (pole barns not heated or cooled). it does no real good running a de-humdifier, if the air current is dead. in multi areas of the basement. central A/C and/or central heating. with correct duct placement for blowing air / return air. can make a large difference. but if the water is coming up through the concrete.... i would say more expensive route and see about getting some drainage under the floor.

if ya go with putting in drainage, you might see if you can find one of them powered 2 wheel tractors. kinda like a walk behind tiller. but you can attach different stuff to it. including a lawn cart for example. lay down some plywood on the stairs for a ramp. with some sticker traction tape. and vroom, vroom, vroom.... it would help getting the concrete out for were the drainage pipe would go. the dirt that would need to be removed, getting rock back down there, and then concrete down there to finish things out.

if you get a big enough concrete saw to cut almost all the way if not all the way through the concrete slab/floor, and make cuts, so you end up with say 12" x 6" chunks, you could use either a prybar and sledge, or an electrical jack hammer to split the chunks. were ya cut. biggest issue is getting cuts between floor you want to keep and the area were drainage would go. these cuts, ya keep jack hammer / sledge away from. so ya do not damage rest of floor. the cuts between the 12"x6" chunks, are more of a wedge/sledge hammer thing once you get things started. so you can give a slight tap "hopefully" and chunks fall out of place to be picked up, before moving on to the next chunk. ""hopefully not to much rebar to deal with""
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers #36  
There is a certain cure which avoids every pitfall that you have considered, but it is probably quite expensive.
The cure involves the entire removal of the old concrete floor, installing perimeter drain tile in a trench to a pumped sump, then covering the old earth level with 3" fine compacted crush, then a good vapour barrier plastic (12 mil), tape-sealed along the seams and then a re-pour of a new concrete floor incorporating a hydraulic sealer and chopped fibre in the mix. This is not a DIY job. You need a good reputable cement finisher to do this kind of work. The new concrete floor would be at least 4" thick, delivered by a ready-mix truck and placed with a concrete pump through a window. That is the "make it right cure" BTW. Then 2" high density foam and place whatever flooring you might like over that, leaving a quarter inch gap at the perimeter. $35.00 per sq foot would cover the cost of the fix unless you went with expensive hardwood (not recommended) AND No Fasteners through the membrane.

You could do it more cheaply, but it would be unsatisfactory over time. IMO
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers
  • Thread Starter
#37  
If that PT wood is real wet, you might want to strap it while it dries out. I just completed several projects in a row with PT, and was real careful to get it nailed down quickly, or strap it down if it had to sit for a while. In the past, I would lose a lot of lumber to warping if it sat around loose while it dried out. That stuff is a PITA to deal with. Would suck if your nice flat floor framing got all wobbly.

When building our home, our builder worked with the kiln dried treated wood (KDAT) and it was awesome. So much more stable and reliable.

Actually, I went the other direction on curing and so far so good. I spaced out all the boards on some saw horses (quarter in gap in between), then put spacers between each row going up vertically. My thought was to let it dry evenly on all sides. Last I checked, they were pretty dry and still straight. I'm sure I'll have a few benders and will either cut them up where I need short pieces, or have to Tapcon them down once the subfloor is in.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers
  • Thread Starter
#38  
just catching your thread...

i would say pond liner or rather epdm roofing liner (for flat roofs) it can be had fairly cheap there is different styles of rubber/plastic out there some cheaper than others pvc, for example.. lay it down, and cut it / fold it so it comes up the walls a 1" or so. maybe a bit more until ya get your walls in. and then put down a floating tong and grove flooring. no need for any sort of shims or like, it goes down and lays right to the curvature of the concrete. and that is how it is. no need to put nails / bolts / screws down into the concrete and through the liner.

any sort of "paint on liners / water proofing" stuff for concrete *big frown* prep work prep work prep work. and again prep work. if ya goof any place, it will peel, bubble away. since your water / moisture is coming from the bottom and up through the concrete... any sort of hydraulic pressure / water pressure, is going to be push up on the paint on stuff. and i just do not see the stuff holding up long term.

6mil plastic :/ does not last, to easy with even slightest of vibrations to tear it / put a hole in it.

if you want to use tile, then just act like it was a customized DIY shower / tub. and use a little bit of tile mud, and set your tiles down into it. and forget the plastic/rubber being placed down.

if ya going to install radiant heating, easiest way IMHO (in my opionin) get yourself some hardboard insulation say 3/4" to 1" thick. using 1/2" pex piping. lay the insulation down on the floor if ya need to score it across the top/bottom so it lays a bit tighter to the floor, use some metal/foil insulation tape over the seams. and then take a router. and grove the hard board insulation out, for were you want to put the pex piping. then place your floating floor (tile or tongue and grove floor on top).

================
but before any of above...i might encourage, cutting up the floor. and installing a french drain like doing, around the perimeter of the basement (along the outside walls) and running to the sump. it is costly, but it will drain water from the soil below the floor. this is rather costly doing, but ya need to deal with that moisture issue first. give it a few years, and that moisture = mold. just trying to cover it up, may never work.

double checking.... the 2 sheds here. will sweet. more of a high temperatures / cool temperatures of morning / night time. toss a fan down and it goes away ((more of water condensing on the floor, more than anything)). certain areas are worse than others. due to how the air movement goes through the sheds (pole barns not heated or cooled). it does no real good running a de-humdifier, if the air current is dead. in multi areas of the basement. central A/C and/or central heating. with correct duct placement for blowing air / return air. can make a large difference. but if the water is coming up through the concrete.... i would say more expensive route and see about getting some drainage under the floor.

if ya go with putting in drainage, you might see if you can find one of them powered 2 wheel tractors. kinda like a walk behind tiller. but you can attach different stuff to it. including a lawn cart for example. lay down some plywood on the stairs for a ramp. with some sticker traction tape. and vroom, vroom, vroom.... it would help getting the concrete out for were the drainage pipe would go. the dirt that would need to be removed, getting rock back down there, and then concrete down there to finish things out.

if you get a big enough concrete saw to cut almost all the way if not all the way through the concrete slab/floor, and make cuts, so you end up with say 12" x 6" chunks, you could use either a prybar and sledge, or an electrical jack hammer to split the chunks. were ya cut. biggest issue is getting cuts between floor you want to keep and the area were drainage would go. these cuts, ya keep jack hammer / sledge away from. so ya do not damage rest of floor. the cuts between the 12"x6" chunks, are more of a wedge/sledge hammer thing once you get things started. so you can give a slight tap "hopefully" and chunks fall out of place to be picked up, before moving on to the next chunk. ""hopefully not to much rebar to deal with""

Wow, lot of thoughts in your post. Just so you know, I'm not going to use 6 mil plastic - changed my mind. Going with Platon membrane which is dimpled and will provide an air space for any moisture to evaporate out where my industrial strength dehumidifier will take care of it. Not going to put any heat down there yet as I'm only doing the floor at this point. If/when I finish it, I would probably just put a propane stove or pellet stove down there. I already have propane so it would just require running a supply line and maybe a vent unless I go ventless, but those worry me some. But again, that's not for now.

As for drainage, I already have exterior footing drains which pull out most of the water that gets to the bottom of the foundation. I might have some blockage in one corner that's causing excessive moisture and I'll deal with that from the outside next Spring. I have a small backhoe and could dig down to the drain pipe by my Bilco doors, them maybe have someone scope it to see what's what.

By the way, spoke with one of my neighbors that finished his basement 20 years ago with plastic sheeting and PT sleepers. Says he had similar moisture issues as me. Says he's had no problems so far with mold, etc., but I guess unless up pull up the subflooring, you don't really know what's going on down there.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers
  • Thread Starter
#39  
There is a certain cure which avoids every pitfall that you have considered, but it is probably quite expensive.
The cure involves the entire removal of the old concrete floor, installing perimeter drain tile in a trench to a pumped sump, then covering the old earth level with 3" fine compacted crush, then a good vapour barrier plastic (12 mil), tape-sealed along the seams and then a re-pour of a new concrete floor incorporating a hydraulic sealer and chopped fibre in the mix. This is not a DIY job. You need a good reputable cement finisher to do this kind of work. The new concrete floor would be at least 4" thick, delivered by a ready-mix truck and placed with a concrete pump through a window. That is the "make it right cure" BTW. Then 2" high density foam and place whatever flooring you might like over that, leaving a quarter inch gap at the perimeter. $35.00 per sq foot would cover the cost of the fix unless you went with expensive hardwood (not recommended) AND No Fasteners through the membrane.

You could do it more cheaply, but it would be unsatisfactory over time. IMO

Not going to happen, but if I ever built new again, I'd make sure there was insulation and a vapor barrier under the slab. Building techniques are (almost) always improving. Too late for this 25-year-old house.
 
   / Basement Sub-Floor Using Sleepers - Need Some Pointers
  • Thread Starter
#40  
Quick update. Got the Platon earlier this week and started over with that as the underlayment vs plastic. Like most things, it wasn't as easy to put down as the instructions and on-line video showed. Biggest issue is that when you roll it out over 30 feet (in my case), it doesn't roll out straight. Has a slight curve to it so mating one row to the next isn't easy. I had to cut each 30' lenght once or twice and seem it to re-align the mating surfaces. Even then, it doesn't roll out totally flat. And boy, does the black plastic make it seem a lot darker down there versus the gray concrete, but that's temporary until I get the rigid foam and subfloor down.

My other issue is that I don't have room to move everything out of the way so I'm having to work one side, then move boxes, etc., to work the other side. Anyway, I'm feeling much better about using the dimpled Platon vs putting plastic right on the slab.
 

Attachments

  • 20141211_135730.jpg
    20141211_135730.jpg
    1,016.4 KB · Views: 250
  • 20141212_154634.jpg
    20141212_154634.jpg
    919.3 KB · Views: 179
  • 20141212_154736.jpg
    20141212_154736.jpg
    766.9 KB · Views: 195

Tractor & Equipment Auctions

2015 LOAD TRAIL 24+6 GOOSENECK TRAILER (A58214)
2015 LOAD TRAIL...
1996 International Water Truck with a Caterpillar Engine (A56438)
1996 International...
Toyota RF1-SD1X45 4,500 LB Stand-On Electric Forklift (A59228)
Toyota RF1-SD1X45...
2015 Kubota RTV-X900 4x4 Diesel Utility Cart (A59228)
2015 Kubota...
2001 PETERBILT 379 (A58214)
2001 PETERBILT 379...
2010 Specialized Structure 1456 (A56858)
2010 Specialized...
 
Top