thatguy
Elite Member
Behind my house i have some land that is VERY bumpy (differences of of 1 to 2' in places) - it appears that sometime pre-me they dumbed backfill there and never smoothed it out.. its rough enough that I tried to bushhog it once, but my 2320 would bottom out over and over (both tractor and rotary cutter) , so I just gave up.. it is also on the side of a hill - up and down is doable.. side to side could be dangerous do the dips/rises. The area is approx 150' x 150' with some of it much smoother than other parts
I have access to a 3pt disk but im not sure i would feel comfortable even going up and down with it..
Would a FEL toothbar work for this? Im thinking (working up/down hill) digging into the high spots to loosen the soil and then back drag it to fill the low spots.. move forward and lather, rinse, repeat..
I figure if i have a contractor do it they would want $200 to $500 (if not more) and for that I could buy a markham toothbar and have it for future uses
thanks
brian
I have access to a 3pt disk but im not sure i would feel comfortable even going up and down with it..
Would a FEL toothbar work for this? Im thinking (working up/down hill) digging into the high spots to loosen the soil and then back drag it to fill the low spots.. move forward and lather, rinse, repeat..
I figure if i have a contractor do it they would want $200 to $500 (if not more) and for that I could buy a markham toothbar and have it for future uses
thanks
brian