What implement(s) do I need?

   / What implement(s) do I need? #11  
If the construction of the house/buildings will be started soon, I say just mow it with a rough cut mower.
If you work the ground up now, when it rains or snow melts, the ground will turn to mud. The deeper the ground gets tilled, the deeper the mud.

Wet ground with cornstalks on it is much firmer than worked up ground.
 
 

Tractor & Equipment Auctions

UNUSED PAIR OF MINI RUBBER TRACKS (A52706)
UNUSED PAIR OF...
(5) Dura Trench Drain Grates (A56469)
(5) Dura Trench...
UNUSED FUTURE FT-ZP210 20' X 30' ALLSTEEL GARAGE (A57193)
UNUSED FUTURE...
2006 JOHN DEERE 650J XLT CRAWLER DOZER (A52707)
2006 JOHN DEERE...
2019 Hitachi ZX300LC Hydraulic Excavator (A55851)
2019 Hitachi...
2016 Dodge Charger Sedan (A55853)
2016 Dodge Charger...
 
Top