Re: Shady Rest has walls...
Neil, <font color=blue>Why don't they do this before the floor and walls go on??
<font color=black>The builder would have poured the basement floor 1st if the plumbing inspection of drains could have been completed sooner. Either way, he says that much of the concrete will have to be handled through the walkout basement doors. He doesn't want to loose a day in order to save 2 hours. The builder started framing while waiting for the inspector. This small contractor with 3 full time crew members, 2 of which are his sons, do all of the work (and they don't mess around) except excavation, concrete, and HVAC. The GC is a certified electrictian while his oldest son is a certified plumber.
<font color=blue>I see why houses are so dear over there. That basement etc. is some major work
<font color=black>Our basement will be important living space /w3tcompact/icons/smile.gif > family/rec room (15'X28'), utility room, bathroom, & storage room. There will be french doors out of the basement onto a patio overlooking the valley/revine to the north.