Power feed

/ Power feed #1  

paul dyar

Bronze Member
Joined
Nov 11, 2009
Messages
50
Location
Anderson S.C.
Tractor
TC33DA
It is my understanding that you have to run a 4 wire cable now. Is the old 3 wire not safe? Is the power co. going to change all the old power feeds?

Paul
 
/ Power feed #2  
4 wire only after the first switch.. 3 wire is still used from the service head to this switch.. At least that is how I read the code..
 
/ Power feed #3  
4 wire only after the first switch.. 3 wire is still used from the service head to this switch.. At least that is how I read the code..

That is correct. Just so happens I had the exact same discussion with the electrical code inspector yesterday. 3 wire entrance cable from pole to meter to service panel/breaker, 4 wire from breaker in main panel to any subfeed panel. A second breaker/switch is not required in subpanel for protection but is recommended for a local disconnect.
 
/ Power feed #4  
Old stuff that followed the code the year it was installed is grandfathered in, don't need to change old feeds.

The 4 wire design - done properly! - makes the ground circut much safer & more reliable. We all hope we never actually use that wire, it is only there for safety, but if wired up properly it can really save a building or a life if something bad happens.

The old way of doing 3 wires & a seperate groundrad at each building allows for some electrical differences between the buildings, and this can set up odd backfeeds & eddies along waterpipe, telephone wires, etc.

Both ways work; the 4 wire way works a bit safer.

--->Paul
 

Marketplace Items

Bauma Light FBS752 Feller Buncher Skid Steer Attachment (A61567)
Bauma Light FBS752...
2019 CATERPILLAR 305.5E2 CR EXCAVATOR (A62129)
2019 CATERPILLAR...
2019 Ford F-350 (A55973)
2019 Ford F-350...
2017 CHEVROLET SILVERADO 2500HD (A58214)
2017 CHEVROLET...
2012 JACK COUNTY TANK 130 BBL STEEL (A58214)
2012 JACK COUNTY...
2025 Pabreak Auger Bits and Plate Skid Steer Attachment (A61567)
2025 Pabreak Auger...
 
Top