Megawisdumb
Bronze Member
Finally got some time to try a new BX25 toy yesterday. WOW. I'll never use my auger again! I slammed about 25 6" posts in a few a few hours but still have a few hundred to pound. It took between 15-20 slams to put the 8 footer at shoulder height. I do need to find a 1/4 spliter so I don't have to keep plugging the supply line to the pounder and back to the 3 pt to move to the next hole. These are much tighter than an augered post and no digging or tapping just drive to next hole. Also, while I have the 3/4 return line rigged up ok back to the res I need to make a longer neck as it drips some from after a few stroke.