Plot in Lumber trails

   / Plot in Lumber trails #21  
Your trails look great, exactly what I am going to do. Ginding just seems like such a slow way of going. I have used a similar grinder but it was on some pretty big stumps 30 inch diameter. I have some time coming in March I will have to see about renting one.

Thanks

Vern,

So I you have 6 to 12" stumps now, maybe 30-40 to do, and a 9"stump is probably 12-15" to really grind down to the base - it will take you about 15 minutes to grind one with a 16" Rayco unit like Foggy suggests.

I did about 4 24"size and 10 6-12" stumps in a day with a similar unit a few years back. But when I had to grind the big ones (30-40" stumps and 6-10' of stump area to be ground) I had a guy come to do these - he did 10 40"+ stumps (ground to 8" below ground 7' around) in 3 hours with a 24" 90HP Vermeer unit.

If you want to do some of your acreage, contract a mulcher guy - they will make fast work of your area. In fact I would hire a mulcher for 2-3 days rather than a stump grinder if you want to see quick results and get to planting.

If you have time. then rent or buy a stump grinder. I would buy one if you have time to work it, and a lot to do, then sell it when done.


Carl
 
   / Plot in Lumber trails #22  
Wow
This is all a pretty amazing discussion. Did you know that the Black Forest in Germany is endangered? A lot of the research is indicating that over the centurys too much has been done to the forest, too much has been taken away. I suggest cutting your stumps at ground level if you need to drive over them, and leave the debris lie to nourish your trees. It is a forest after all. If you want a pasture, get a pasture.
mf
 
   / Plot in Lumber trails
  • Thread Starter
#23  
Carl
Thanks I will look into a mulcher.
 
   / Plot in Lumber trails #24  
Mudfarmer,

I agree with leaving a forest a forest and letting nature do its thing, but sometimes cutting and thinning is needed. In the last 5 years in this area we have seen 95MPH hurricane force winds off the ocean shear off the tops of 100' pines, and same for microbursts touching down in NH taking down a large swath of trees in 10 minutes time.

The pines we have taken down or have blown down are probably 80-100 yrs old and more than 40% had core rot at the base which I am told is what happens as pines age then eventually they fall down or create "leaners" which are dangerous in the woods - yes eventually they will fall and new growth will occur.

These pics are from my office deck and our patio with our new teak set after a microburst we had 10 trees down, and three were bent so we took them out and left the hardwoods..
 

Attachments

  • Picture 002.jpg
    Picture 002.jpg
    306.7 KB · Views: 304
  • IMAGE_165.jpg
    IMAGE_165.jpg
    70.8 KB · Views: 293
  • IMAGE_166.jpg
    IMAGE_166.jpg
    67 KB · Views: 304
   / Plot in Lumber trails #25  
Wow
This is all a pretty amazing discussion. Did you know that the Black Forest in Germany is endangered? A lot of the research is indicating that over the centurys too much has been done to the forest, too much has been taken away. I suggest cutting your stumps at ground level if you need to drive over them, and leave the debris lie to nourish your trees. It is a forest after all. If you want a pasture, get a pasture.
mf

You gotta be schmiding me. Whether you grind a few stumps or let them decay naturally has little to do with the "debris to noursih your trees".

I have seen the Black Forest, and understand some of the obsessive micro management that goes with the German culture (in the Black forest). In some areas they groom every inch of the forest and pick up every fallen leaf....it's like they cannot leave anything to nature. I dont think that's what is being suggested here.....not even close.

One could make the same argument about the shed in your picture.....better get that off the pasture....as its diminishing the land and preventing legumes from growing. :confused2: Some level of management is needed if people are going to use the resource.
 
   / Plot in Lumber trails
  • Thread Starter
#26  
Sent off to Whitetail Institue for a soil sample, they are really quick, sent Monday results Thursday.

PH is 5.3 - recomend 5000 lbs of lime per acre. Good thing I am not doing an acre.
 
   / Plot in Lumber trails
  • Thread Starter
#27  
Planted Whitetail Institues no till a week and a half ago. Clover is coming up.
 

Attachments

  • Clover.jpg
    Clover.jpg
    144.9 KB · Views: 256
   / Plot in Lumber trails #28  
So Vern,

Did you get a grinder or a mulcher in to clean your place up? Just curious seems I might have missed that part..

Let me know how that turned out and what you did with the chips.
 
   / Plot in Lumber trails
  • Thread Starter
#29  
Carl

I made a brush fork for my loader and stacked the tailings at the end of the logging trail my the stump. then took a landscape rake and racked as much of the little stuff I could get. Its about 150' by 20'

I contacted a mulcher - 4 hours away and want 1200 per day plus a set up fee. Found one place the use to rent them but due to insurance issues they have stopped.

We have a burn band on right now so just stacking what I can until I can burn it. Have been looking at a 3 point stump grinder for my tractor but 3600.00 for it. Also looking at a used DP 3 point chipper that will do 4 1/2 in dia. but that is soooooo labot intensive.

Vern
 
   / Plot in Lumber trails
  • Thread Starter
#30  
Food plot at 4 weeks.
 

Attachments

  • food plot wk 4.jpg
    food plot wk 4.jpg
    91.6 KB · Views: 247

Tractor & Equipment Auctions

2019 Takeuchi TL8 Track Skid Steer (A50860)
2019 Takeuchi TL8...
2005 Ford Escape XLT SUV (A48082)
2005 Ford Escape...
Vermeer WR20 Hay Rake (A48837)
Vermeer WR20 Hay...
Ford Super Duty 8ft. Truck Bed (A49346)
Ford Super Duty...
2014 Ford Escape S SUV (A48082)
2014 Ford Escape S...
UNUSED Grey Metal Roof Panels (A50860)
UNUSED Grey Metal...
 
Top