They poured both garages today. Only got a picture of the detached garage because they were still working on the other one...
View attachment 456489
Just a thought. Normally here they screw a 3/4" wood strip on top of the form board at the overhead doors set to floor height. After concrete is screeded level and set a bit, they remove the 3/4" strip then cut a taper to the door location so water drains away from door instead of having a chance to go inside.