New garage time!

/ New garage time!
  • Thread Starter
#1,144  
Got the z brackets in. Finished putting all the panels down except the last ones. I need the 15' brake to break the last ones so that's on hold. Finished the j-channel on the front, put hte z brackets in to hold the vent cap on, then put the cap on. Caulked all around the z channel.

The scissor lift is still acting up. No smoke, but when I turn the key, I smell burning. So I put all the stuff on the lift, sent it up, then turned it off, and then climbed the scaffolding. Easily 15 trips up the scaffolding today, and i'm completely beat. Everything hurts. As soon as the roof is completely finished I'll pull the scissor lift into the garage and take it apart to see what's burning.

1NZ8OBl.jpg


waS3FgD.jpg


maJZUnt.jpg


jFQ8Cn8.jpg


ssN6F3j.jpg


8kOdOiI.jpg
 
/ New garage time! #1,145  
Sure is a nice roof, will last many, many years. (y)
 

Marketplace Items

(15) Polyethylene Road Bed Protection Pads (A60463)
(15) Polyethylene...
1997 John Deere 5300 (A60462)
1997 John Deere...
300 Gallon Front Mounted Saddle Tank (A60463)
300 Gallon Front...
2012 NISSAN 110 FORKLIFT (A55745)
2012 NISSAN 110...
1999 C Bar Stock Trailer (A60463)
1999 C Bar Stock...
2019 CHEVROLET SILVERADO CREW CAB TRUCK (A59823)
2019 CHEVROLET...
 
Top