So a few weeks back I had a company come out and to balance the Fecon. I was not present but a good mechanic was on hand to help. I had taken off the teeth thinking this would help...first mistake. They tried to balance the head with no teeth but could not get it close. They also measure about 8/100 play in both bearings.
I ordered both bearings (about 1400) and one stub shaft (about 650) as one of the bearings was seized on. We get that all put together and he comes back and still can't get it right...we measure about 8/100th wobble in the other stub shaft...order a stub shaft, replace and went back to work with the head off balance as bad as when we started. In the next two weeks I rip off two tooth holders and weld those back on...it gets worse.
Now the head is running really bad and I need to get it balanced but after all the new parts and the balancing guy come two times ($1100) I'm out $4000 +/-.
So Friday I order a vibration analysis machine and got it today. A little hard to figure out but within 3 hours my Fecon is running like NEW. A little pricey up front but I'll save cash in the long run and I will not have any down time.
I'll probably do a few heads others when I can and it will pay for itself...right?
How much do you guys pay for balancing? My guy was $95 per hour...port to port. I pay a 26 tired lowboy $95 per hour to move my excavator so I felt this was out of line.
I ordered both bearings (about 1400) and one stub shaft (about 650) as one of the bearings was seized on. We get that all put together and he comes back and still can't get it right...we measure about 8/100th wobble in the other stub shaft...order a stub shaft, replace and went back to work with the head off balance as bad as when we started. In the next two weeks I rip off two tooth holders and weld those back on...it gets worse.
Now the head is running really bad and I need to get it balanced but after all the new parts and the balancing guy come two times ($1100) I'm out $4000 +/-.
So Friday I order a vibration analysis machine and got it today. A little hard to figure out but within 3 hours my Fecon is running like NEW. A little pricey up front but I'll save cash in the long run and I will not have any down time.
I'll probably do a few heads others when I can and it will pay for itself...right?
How much do you guys pay for balancing? My guy was $95 per hour...port to port. I pay a 26 tired lowboy $95 per hour to move my excavator so I felt this was out of line.