5030
Rest in Peace
- Joined
- Feb 21, 2003
- Messages
- 28,967
- Location
- SE Michigan in the middle of nowhere
- Tractor
- Kubota M9000 HDCC3 M9000 HDC
Construction contractors, much like every other contractor usually leave a mess behind.
We used to grow acres of potatoes and strawberries. Brown shows locations of some of our past potato fields. The blue square is the location of another log house from the 1800s-early 1900s , and the reason the barn is away from our house, as this was originally a different parcel of land. The blue circle is another dug well, and the purple circle is our well house, over top of a dug well, feed from the barn roof rain. Over half of the existing barn was added on by dad in the 1950s.I just planted our familys legendary potatoes
When negotiating with the lawyers for the oil/gas pipeline, they said "they won't put down stone for access, they will just put down timber mats to drive on" Boy were the lawyers wrong....... They do have to reclaim it, but if the road is in good shape when they are done, we might just keep it there.
View attachment 3363774
Top of this pic is the after shoot of the new road....
View attachment 3364510
The problem is the lawyers did not specify it in the contract, except we do have a reclaim clause, so either way works. I prefer the stone.That seems rather like "do not listen to what they say, read what is in the contract...", but I am glad you are ok with it.
Why the temporary water line in the first place?
All the best, Peter
Line is gathering from multiple pads.I would guess that line is connecting to the line running 1/4 a mile from my place as we speak.