John Deere TLB 110

   / John Deere TLB 110 #1  

richieg

New member
Joined
Apr 13, 2010
Messages
21
Location
Long Island new york
Tractor
John Deere TLB 110
looking to buy a JD TLB 110 anything i should be looking out for that may be common problem. How many hours should that motor last before it needs to be rebuilt.
thanks
Richie G
 
   / John Deere TLB 110 #2  
Welcome to TBN,
The biggest issue is the loader mount bolts, if they where allowed to get loose the bell housing casting would crack.
The Yanmar engine are pretty bulletproof, as are the e-hydro transmissions if they are well maintained.
 
   / John Deere TLB 110
  • Thread Starter
#3  
Hey Kenny that's for reply I am new to JD can you point out where you are talking about would be much appreciated. I like the hooks and the diff peddle going to look at a machine this weekend I will be ordering the hooks and peddle when I get a JD
Thanks
Richie G
 
   / John Deere TLB 110 #4  
can you point out where you are talking about would be much appreciated.

I believe there are a few tbn treads about it, but a quick google search should bring good results.

I wish you luck, most 110 owners are quite helpful, so if you have any perspective units, post details.
 
   / John Deere TLB 110 #5  
some cost/expense factors to consider:
-if the tires have been filled with liquid ballast...saves about $300; lots of confusion in blogs about ballast but if you carefully read the JD manual they say 'have it done by a professional/tire store'. Unit has much-improved stability with tire ballast (fyi: also be careful trying to operate without the hoe on the back, way tippy)
-if you are in snow country there is no way to put chains on the rears without wheel spacers...a cost of hundreds of dollars
-side exhaust pipe gets pretty stinky and conversion to a vertical is another few hundred bucks (JD has marks under the hood for the cutout which if used makes a tight job raising the hood so a snug press fit pipe is nice for easy removal)
 
   / John Deere TLB 110 #6  
some cost/expense factors to consider:
-if the tires have been filled with liquid ballast...saves about $300; lots of confusion in blogs about ballast but if you carefully read the JD manual they say 'have it done by a professional/tire store'. Unit has much-improved stability with tire ballast

Deere does not recommend filled tires when using the hoe--extra stress to the out-riggers? I have never heard of a failure, but I had a leaking stabilizer cylinder, without the tires filled.

I think the hardest thing to find is the aux rear hydraulic option--not all have the 7th function on the hoe, but that can be added, with much less difficulty than the 3pair of rear remotes
 
   / John Deere TLB 110
  • Thread Starter
#7  
thanks everybody i pulled the trigger on a 2011 with front and rear hydraulic and 1200 hours nice and clean and tight, spent a little more than i wanted to but it was a local machine so i didn't have to pay shipping paid $28,000 going to pick up on saturday
thanks again
 
   / John Deere TLB 110 #8  
thanks everybody i pulled the trigger on a 2011 with front and rear hydraulic and 1200 hours nice and clean and tight, spent a little more than i wanted to but it was a local machine so i didn't have to pay shipping paid $28,000 going to pick up on saturday
thanks again

Congratulations! Please post pics when you get time.
 
   / John Deere TLB 110 #9  
Congrats. I believe that was the last year they were made.

As someone once said "pics, or it didn't happen.."
 
   / John Deere TLB 110
  • Thread Starter
#10  
yes i think it was the last year i am finding it hard to find a good web site fr OEM parts any info would be appreciated brought it home today i did not have time to play as soon as i get a chance i will post pictures.
thanks
 

Tractor & Equipment Auctions

2016 JLG 3248RS 32ft Electric Scissor Lift (A50322)
2016 JLG 3248RS...
3HP Electric Fans (A50854)
3HP Electric Fans...
2016 John Deere 35G Mini Excavator (A49461)
2016 John Deere...
Craftsman LT2000 42in. Riding Mower (A49346)
Craftsman LT2000...
4 1/2 150G DRILL STEM 358 JOINTS (A50854)
4 1/2 150G DRILL...
1989 Freightliner FLD120 (NEW CAT 3406A, NEW REAR ENDS, CLUTCH) (A51039)
1989 Freightliner...
 
Top