Bundi
Member
Just wanted to post a note about the instillation of a front mount snow blower on my 1025r. It is very easy to convert over but am a little disappointed that I had to remove my MMM Hydraulic lift to get the drive shaft attached. I think I could have just put the lift in the full down position but then would run the chance of it being jammed up into the shaft.
I think I had to remove the lift - anyone know if I should have just dropped it into the down position and called it a day?
Beside removing the lift the rest of the instillation was about 20 min because the freaking thing ways a TON


I think I had to remove the lift - anyone know if I should have just dropped it into the down position and called it a day?
Beside removing the lift the rest of the instillation was about 20 min because the freaking thing ways a TON

