#21  
Better to adjust Box Blade tilt by moving LEFT Lifting Rod stirrup pin to one of the two lower adjustment holes available. Lower hole = less lift = tilt to left. (RIGHT works equally well but only two, rather than three adjustment holes on right.)

Then fine tune tilt with adjustable Right Lifting Rod. Less stress on the Lifting Rods following this procedure.

That is a great tip. Thank you.

Quick update. Had an excavation company come out with a large excavator and fix the bottom of section 2 where it was washing out against the bridge abutment.

Had planned to have a load of crusher run brought in but the weather changed to rain. It is now raining for the next two weeks so I am SOL on getting any work done on the road.
 

Marketplace Items

2017 CATERPILLAR 305E2 CR EXCAVATOR (A60429)
2017 CATERPILLAR...
Kubota M4700 4WD 51HP Utility Loader Tractor (A56857)
Kubota M4700 4WD...
2019 DRAGON ESP 150BBL ALUMINUM (A58214)
2019 DRAGON ESP...
UNUSED FUTURE FT-180H HYD ROTARY TILLER (A52706)
UNUSED FUTURE...
2006 iDrive TDS-2010H ProJack M2 Electric Trailer Dolly (A55853)
2006 iDrive...
2016 CATERPILLAR TH255C TELESCOPIC FORKLIFT (A60429)
2016 CATERPILLAR...
 
Top