Good morning. After a day of what turned out to be continuous rain yesterday, it has dried up overnight and looks to be staying that way for the rest of the morning.
Ron, the extra guttering is to link both the north and south slopes of the roof. My thinking is that if I put some filtration in, I won't have to clean out stinky storage tanks as often as I do at my other shed and I will be able to use low pressure float valves on water troughs without them constantly blocking. I've yet to fix a galvanised tank I've had in storage for the last 5 years and work out the best way to remove leaves from the first flush drop pipe, but with David to mentor me once he's finished his roof, it should all eventually come together fine.
Drew, cutting spuds at 4:30am! Hope all that activity yesterday gave you a good night's sleep.