63 degrees, overcast and humid ... kinda chilly out there. Got a good bit of rain yesterday afternoon/evening. Tornado warning up by Cleveland.
Was up in the shed till 3 AM again ... more cleaning, organizing, and stowing away ... more stuff off the floor and onto the shelves.
Flat washers mostly sorted out by size. Ordered drawer dividers for the storage cabinets. Got the airtool oiler cleaned out, refilled and put back together. Took one 8' double fluorescent fixture down in order to relocate it to the center of the room. Cleaned off the extension cords for the plasma cutter and the MIG and got them hung up. Sorted out the band clamp inventory by size. Empty boxes vacuumed out, ones with tops closed up and all of them stowed away (box in a box in a box ...) Almost have the scaffold platform cleared off. Cleaned the ashes out of the wood stove and the ash bucket and stuck those the trash.
Installed the compact bender and got it bolted to the floor ... lovin' the hammer drill ... only took about a minute per hole (1/2" x 3+ inches deep) to drill the slab. Still have the tubing bender stand, drill press, and vise stand to do.
Also still need to run about 10' of 3/4" copper for the air supply on the west side of the building, and hang the small piece of pegboard over the bandsaw and bench grinder, and cut a 2' x 2' piece of 3/4" particle board to replace a section of shelf.
And permanently wire the outlet for the compressor and MIG ... thinking about replacing the load center in the building ... the one that's in there is the original ... it's 100A but only 4 spaces and no main breaker on it (main lugs only) ... also there's no ground rod installed at the building ... so should probably stick one in.
Got the pics and dimension info for the grapple and and reviewed that ... I made a few lucky guesses and a few bad assumptions ... glad I asked.
Today is Christmas in July ...
