Morning all, 17 going to 40 and sunny.
First phase of closet rebuild complete. Some shelves moved and chest is in.
Now to get son to put everything away so I can move clothes rod as last step.
Bed arrives today and need to get part built to swap with old bed and figure out where old bed goes until we find a place for it to end up.
I use Dell Win 11 phonelink and Samsung S23 for photos. I have an iphone for work and rarely use it. I never need to resize, all taken care of for me.
Door into garage framed, last of the supports covered. a few small panel bits and the one window frame left and then some corner metal and bracing and on to the shelf project for the garage. So close to done, finally.
By then it'll be more outside projects, looking forward to that and getting rid of all the construction waste.
Be well.
After removing four bags of stuff from closet and the left over is now moving into the new drawers. Still need to move the hanger rod and maybe one of the shelves. But almost done. And I didn't make a mess as most of the work done in the garage and brought up for dry fit then install.