Finally got the OK from the building dept. to start diggin'... and after 15hr of seat time I'm 75% there
. The wall I'm diggin out is 26' x 8' tall and I'm going out about 60'-70' out to level (with a slight slope away from the hose). Diggin' in pond clay (tea time of over 85) is soooo much fun
. I'm also hauling the dirt about 200ft away from the house one bucket @ a time
now for da pics..
first and second pass


forming the pile

some hidden gems


one bucket @ a time

the inspector

end of day one.. 10hr

The front turfs on the tractor were not in the best shape to begin with. The stress of full buckets of clay being carried all day long was all they needed to call it quits. I ordered a set of Carlisle TrackChiefs from StateWide tire in IL, who happened to have the 25x8.5x14's in stock, and had them delivered by my bro within a week
. The new tires are a huge improvement and with a max load of just over 2100lbs. per tire, I don't think they will have any problems handling whatever I can throw at the tractor



now for da pics..
first and second pass


forming the pile

some hidden gems


one bucket @ a time

the inspector

end of day one.. 10hr

The front turfs on the tractor were not in the best shape to begin with. The stress of full buckets of clay being carried all day long was all they needed to call it quits. I ordered a set of Carlisle TrackChiefs from StateWide tire in IL, who happened to have the 25x8.5x14's in stock, and had them delivered by my bro within a week