UpToNoGood
Bronze Member
I want to do some foundation work myself and have never worked with concrete other than mixing a bag and dumping it in a hole for a fence post.
Any way I picked up 40 acres and want to build a vacation/retirement house over time, but figured I would start with a shed first.
I want the shed to have a concrete floor and maybe cinder blocks for 2 layers followed by wood and a Metal roof.
I am not going to work the concrete when it is poured that would be hired out for sure.
I do plan to set the form myself before the concrete is poured. About 15x20. So my question is would re-bar be needed or could I just use the wire mesh?
I will also be setting a form for a 500gal propane tank to sit on for the same concrete pour.
Think 5 inch thick will be fine for both?
Any way I picked up 40 acres and want to build a vacation/retirement house over time, but figured I would start with a shed first.
I want the shed to have a concrete floor and maybe cinder blocks for 2 layers followed by wood and a Metal roof.
I am not going to work the concrete when it is poured that would be hired out for sure.
I do plan to set the form myself before the concrete is poured. About 15x20. So my question is would re-bar be needed or could I just use the wire mesh?
I will also be setting a form for a 500gal propane tank to sit on for the same concrete pour.
Think 5 inch thick will be fine for both?