witterbound
Member
- Joined
- Apr 29, 2008
- Messages
- 30
I've got a 40 x 30 spot to clear for a foundation.  I've probably got to cut 4' from the high side to even it out.  Then I've got to dig down around the premiter a couple of more feet for the footings.  I'm going to buy a 72" box blade.  Thinking of a heavy duty type, not a KK TS type.  I've got a 55 hp tractor.  Can I do this with a box blade?
	
		
			
		
		
	
				
			 
  
 
		 
 
		 
 
		 
 
		