Best and worst part of your job

   / Best and worst part of your job #31  
Worst ... in order:
& Dealing with Govt bureaucracy
& 4hr daily commute

Best:
& Varied interesting tasks
& Dealing with some of the smartest most creative people around
& I only work 20 or so hrs per week T-Th

I am in Design Engineering and Testing
larry
 
   / Best and worst part of your job #32  
Worst ... in order:
& Dealing with Govt bureaucracy
& 4hr daily commute

Best:
& Varied interesting tasks
& Dealing with some of the smartest most creative people around
& I only work 20 or so hrs per week T-Th

I am in Design Engineering and Testing
larry

4 hour commute....yikes
i could not handle that... 30 minutes does me in
 
   / Best and worst part of your job #33  
Iv never lived within 30 minutes of work. That would be too close to civilization.:D
larry
 
   / Best and worst part of your job #34  
Wow, that's too far.

My commute is approximately 6 minutes ... 7 when traffic is heavy :ashamed: :eek:
 
   / Best and worst part of your job #35  
The best part = Pension & Benefits

TheWorst part = Having to spend enough years working to get them.:thumbsup:
 
   / Best and worst part of your job #36  
Engineer for the world's largest chip maker. Less than 3 months to retirement.

The good? The hours are loose. As long as the job gets done, no hours are tracked. I average 6-7 hours per day, four days a week and one or two of those days I work from home. Free soda, fruit.

The bad? When I am there, it's me and my cubicle, four gray walls. Nearly all communication is done via Live Meeting or email.
 
   / Best and worst part of your job #37  
Two-three weeks in and when when I stop talking and get the bambi in the head light look, I know I am in trouble. Then, later on when these "people" are asked to do something they say I had not shown them that.

It's time for a check list that each employee signs. Make people sign EVERYTHING.

I used to get that a lot when I worked for a major corp. I used to get called on the carpet for NOT OFFERING a particular up-sell product, even though I didn't and was refused by the customer. From that day on, every contract that went out not only had what the customer bought, but also has everything that was "suggested as an upsell and decline"
Contact read Product 1 - $0.00 , Product 2 $0.00 CUSTOMER DECLINED product 3 $0.00 CUSTOMER DECLINED $0.00.
Yep more work on my part but it shut the boos right up, never did call me in again. It saved me even with a customer, who swore up and down they ordered one thing from me, but they signed a contract that explicitly stated CUSTOMER DECLINE PRODUCT "A"...that was a big WHEW.

Then when it came time to distribute copies of the paperwork the secretary placed a copy in everyones cubby hole mail box. When something wasn't done or ordered they would simply say " I NEVER GOT THE PAPER WORK.

From that day on the secretary walked the contract to each individual and made them sign the MASTER copy.

Now when they attempted the old " I never got the paper work" line, I would simply show them their signature and then it was all on them.

I will admit this though I have used this "sign here" approach to this day and it has saved me more than I can count.

People always want to blame someone else, but if you made them sign there is no blame, or if they try to blame, I just bring out the signed paperwork.
 
   / Best and worst part of your job #38  
Best part is it is my company and have my son working with me.

Worst part is that I have a pr**** (tractor) for a boss and have my son working for me.:laughing::laughing:

Environmental consulting firm:thumbsup::thumbsup:
 
   / Best and worst part of your job #39  
Worked for CN Rail for 35.5 yrs as a Conductor
Best part was the summer
Worst part was the winter
Just retired so I dont have to worry about winter anymore
 
   / Best and worst part of your job #40  
The best: the commute is 1.5 miles.

The worst: my heart is in mechanical engineering but I work as software tester now
 

Tractor & Equipment Auctions

2016 VOLVO VNL300 TANDEM AXLE DAY CAB (A51222)
2016 VOLVO VNL300...
2012 FORD F-650 SUPER DUTY BOX TRUCK (A51243)
2012 FORD F-650...
Hilti TE 2000-AVR Electric Jack Hammer (A49461)
Hilti TE 2000-AVR...
2013 KOMATSU PC490LC-10 EXCAVATOR (A51242)
2013 KOMATSU...
2012 MACK CHU613 (A50854)
2012 MACK CHU613...
2014 Therm Dynamics TD400 Towable Flameless Heater Trailer (A49461)
2014 Therm...
 
Top