   / Dig septic bed with front end loader #71  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
 
   / Dig septic bed with front end loader
  • Thread Starter
#72  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
That's about right. Keep in mind that the digging here was easy. Almost 100% sand except for a tree stump that had to be removed.
 

Tractor & Equipment Auctions

https://www.accessnewswire.com/newsroom/en/healthcare-and-pharmaceutical/slimjaro-vs-burnjaro-reviews-a-comprehensive-analysis-of-benefits-and-1044755
https://www.accessn...
2006 Utility 3000R 53ft T/A Reefer Trailer (A51694)
2006 Utility 3000R...
2011 Kubota L3200 (A50123)
2011 Kubota L3200...
2016 Big Tex 24ft. T/A Flatbed Trailer (A50323)
2016 Big Tex 24ft...
2013 Big Tex 16GP-20 Gooseneck Trailer (A53117)
2013 Big Tex...
2008 Ford Crown Victoria Sedan (A51694)
2008 Ford Crown...
 
Top