2305 & Curtis Cab

   / 2305 & Curtis Cab #11  
The first one will take about 7 hours plus what ever accessories you get. The heater took an additional 2 hours. If you do a second one maybe 5 hours will get it done.

I understand that it takes quite a while to install the cab initially. Are you planning to leave it on all year round? I'd expect to remove it for the warmer months. That's what I was hoping to hear about.
 
   / 2305 & Curtis Cab
  • Thread Starter
#12  
I understand that it takes quite a while to install the cab initially. Are you planning to leave it on all year round? I'd expect to remove it for the warmer months. That's what I was hoping to hear about.

I will never take it off because it is very windy here and I don't want to deal with the plumbing for the heater. In the dog days of summer I will take the doors off and maybe the rear window because it doesn't open. It will take longer to find a safe place to store them than it will to remove them.
 
   / 2305 & Curtis Cab #13  
I have a soft side cab on my 2210. Same cab except for the fiberglass doors and rear panel.
It takes about an hour and a half to take it off for the summer and re-install it for the winter. The windshield is a little challenging without a second person.

I put 1/4 turn ball valves on the heater lines. I disconnect the hoses and tuck them behind the engine side panel for the summer.

I put weather pack connectors on the harness for the radio, wiper, cab lights and heater blower motor.

I also have rops lights so I use the same connector and swap it between the rops and cab lights.
 

Tractor & Equipment Auctions

2016 Club Car Precedent Electric Golf Cart (A53424)
2016 Club Car...
2022 Chevrolet Tahoe FL SUV (A55758)
2022 Chevrolet...
2023 54' Hooklift Dumpster 15 Cubic Yard (A55788)
2023 54' Hooklift...
UNUSED LANDHONOR BS-12-2500G BALE SPEAR (A54757)
UNUSED LANDHONOR...
(INOP) 2008 INTERNATIONAL WORKSTAR 7500 DUMP TRK (A51406)
(INOP) 2008...
2017 CATERPILLAR 299D2 SKID STEER (A52705)
2017 CATERPILLAR...
 
Top