LD1
Epic Contributor
Just though I'd share a rew pics of a couple of loads we cut sunday.
We actually hauled out 3 loads, the pics only show two. The last two pics are of the same load.
We hauled out two already split like the first pic, and then a load of unsplit.
Who says ya cant fit a full cord on a P/U without racks:laughing:
Heading back to cut more here shortly. This makes about 4 cord total taken from this ash tree, and we arent quite half done with it yet
We actually hauled out 3 loads, the pics only show two. The last two pics are of the same load.
We hauled out two already split like the first pic, and then a load of unsplit.
Who says ya cant fit a full cord on a P/U without racks:laughing:
Heading back to cut more here shortly. This makes about 4 cord total taken from this ash tree, and we arent quite half done with it yet