You know the TBN rule... pictures or it didn't happen. You have 2 monthsNot something I did with my GC1720, but something that I did for the tractor. Gearing up for winter, I ordered a Cover My Tractor brand soft cab. They estimated 6 weeks or so for delivery.
OK, I'll get photos up as soon as it's installed.You know the TBN rule... pictures or it didn't happen. You have 2 months
can you post link?Not something I did with my GC1720, but something that I did for the tractor. Gearing up for winter, I ordered a Cover My Tractor brand soft cab. They estimated 6 weeks or so for delivery.
I made a thread on it at the time, showing dimensions and stuff, and some other posters had great ideas there too:Thank you very much. That's what I need.
I made a thread on it at the time, showing dimensions and stuff, and some other posters had great ideas there too:
mower deck dolly
I build this mower deck dolly, as inspired by another poster on TBN. I had a 1" chrome rod laying around, leftover from another project, so went hunting for a 1" axle bore wheel. Surprisingly hard to find those, but I finally tracked them down on Ebay, from a vendor from England. Low and...www.tractorbynet.com
GC1720 Cabcan you post link?