Well Pulling Rig 3 pt

/ Well Pulling Rig 3 pt #21  
We had our pump, pipe, wiring, control box and pressure tank replaced 18 months ago for right around $3000. I did the pressure tank, pump guy did the control box due to time issues. He came back to replace pump/pipe/wire. Our well is 200' deep, pump is set around 180'. We started in '93 on poly pipe, changed to galvanized steel, and now have schedule 120 PVC with stainless steel couplers.
 
/ Well Pulling Rig 3 pt #22  
My original well pipe was galvanized iron pipe, which was replaced last October because it leaking (rusted away). The well contractor replaced it with schedule 80 white white plastic threaded pipe (300').

Believe that is what local pump maintenance and drillers use... Its all I ever see on the trucks and we are in well country....My well is 468 feet deep, and don't know how deep pump is (no records when we bough property)....

Dale
 

Marketplace Items

New/Unused CFG Industrial H15R Mini Excavator (A65579)
New/Unused CFG...
2020 CATERPILLAR CS54B SMOOTH DRUM ROLLER (A65053)
2020 CATERPILLAR...
2022 EZ-GO ELITE ELECTRIC GOLF CART (A63276)
2022 EZ-GO ELITE...
250 gal Livestock Lick Tank (A66408)
250 gal Livestock...
Landhonor 11' x 19' Metal Carport (A66408)
Landhonor 11' x...
2025 LandHonor LHR-SBC19 19 Gallon Portable Sand Blasting Cabinet (A64194)
2025 LandHonor...
 
Top