Johnkn
Platinum Member
Thanks all, the existing EMT conduit is ~1.16" OD, I think it's called 1 " EMT. Correct, because my main panel is full, was looking for a solution to upgrade the current breaker/wiring to support both the compressor and potentially a new welder. What I'm hearing is that I may have to install a small sub-panel at the work bench and run individual recepticals off of it. I was planning on pulling the existing 10ga wiring out of the conduit and pull 6-8 gauge in behind, it. thanks