Hi - I’m trying to lay a bit of field tile - the 4 inch junk that Homedepot and Lowes sells. Also I’m putting some catch basins and running them into schedule 40 (4 inch) . I’ve watched it rain out here a couple years and have a basic idea of run off / grade. I’ve also checked it using 100 ‘ of clear poly vynal 3/8 id tubing for a “water level” driving metal posts and securing the poly hose at 100’ or so. Looks like I have about half a degree of fall. That complicates things. The a schedule 40 is just being used where I know it will be driven over - but in that same trench I’d like to put perforated pipe.
Anyway - any experience using water levels and accuracy? I’m in the 1/2 degree slope by what I read. Both by water level and string line. Metal post set about 100 foot apart