Trailer build question

/ Trailer build question
  • Thread Starter
#41  
I did buy some pipe for my ATV trailer build, that I am in the process of currently. It's going to be a dump trailer. The tubing is 1 3/8 OD at 3/16 wall. Heavy stuff, got NEW tubing for $25 for a 31ft section, and I also go some 1 7/8 tubing 3/16 wall for $39 for 31ft. The 1 3/8 slips inside the other so that feature will come in real handy.

My design will be very similar to the DR VersaTrailer Versa Trailer: 1/2 Ton Commercial Grade Utility Trailer | DR Power Equipment. I am debating on sheet metal sides or expanded metal.

I'll post some pics of it soon.
 

Marketplace Items

Blast Off Hot Pressure Washer Trailer (A61567)
Blast Off Hot...
2018 FORREST RIVER WILDCAT BUMPER PULL (A60736)
2018 FORREST RIVER...
1993 East 39' Dump Trailer (A60462)
1993 East 39' Dump...
2000 Hyster S50FT (A55973)
2000 Hyster S50FT...
2017 PETERBILT PB337 HYDRA-TAIL FLATBED TRUCK (A59823)
2017 PETERBILT...
2022 KUBOTA SVL75-2 SKID STEER (A62129)
2022 KUBOTA...
 
Top