Trailer build question

   / Trailer build question
  • Thread Starter
#41  
I did buy some pipe for my ATV trailer build, that I am in the process of currently. It's going to be a dump trailer. The tubing is 1 3/8 OD at 3/16 wall. Heavy stuff, got NEW tubing for $25 for a 31ft section, and I also go some 1 7/8 tubing 3/16 wall for $39 for 31ft. The 1 3/8 slips inside the other so that feature will come in real handy.

My design will be very similar to the DR VersaTrailer Versa Trailer: 1/2 Ton Commercial Grade Utility Trailer | DR Power Equipment. I am debating on sheet metal sides or expanded metal.

I'll post some pics of it soon.
 

Tractor & Equipment Auctions

2018 Chevrolet Tahoe 4x4 SUV (A50324)
2018 Chevrolet...
2020 CATERPILLAR 326 EXCAVATOR (A51242)
2020 CATERPILLAR...
2019-2024 Dodge Ram Front Bumper (A49461)
2019-2024 Dodge...
2017 Ram 5500 4x4 Utility Truck, VIN # 3C7WRNEL7HG551780 (A48836)
2017 Ram 5500 4x4...
2019 CATERPILLAR 299D2 SKID STEER (A51242)
2019 CATERPILLAR...
2005 CATERPILLAR 12H MOTOR GRADER (A51406)
2005 CATERPILLAR...
 
Top