tn85 4 point

   / tn85 4 point #1  

sammyd

Bronze Member
Joined
Oct 6, 2007
Messages
67
Been messing with this for a while and am at a loss. Have 3 point forkd to move round bales. When I had them on my IH they worked great went all the way down and rested flat on the ground. Now on my NH they won't come close to the ground no matter what I do with the 3 point levers. Manual isn't any help either. Any ideas?
Tia...
 
   / tn85 4 point #2  
Do your side lift arms have different holes to attach to the main lift arms,
how much can you lengthen the lift arms,
Are the swaybars limiting travel.
 
   / tn85 4 point #3  
Do your side lift arms have different holes to attach to the main lift arms,
how much can you lengthen the lift arms,
Are the swaybars limiting travel.

Don't forget to lengthen the top link too.
 
   / tn85 4 point #4  
Unpin and lengthen the left hand lift link. Lengthen the right hand line using the crank handle. Lengthen the top link to level the forks.
 
   / tn85 4 point #5  
Drill holes up higher on the fork frame and move the pins up.
 

Tractor & Equipment Auctions

2019 GEHL RT105 SKID STEER (A52707)
2019 GEHL RT105...
SHOPBUILT 40FT FLARE STACK (A52472)
SHOPBUILT 40FT...
2020 DRAGON ESP 150BBL ALUMINUM (A58214)
2020 DRAGON ESP...
UNUSED RAYTREE RMPP680 HYD POST POUNDER (A57193)
UNUSED RAYTREE...
2021 CATERPILLAR 259D3 SKID STEER (A52707)
2021 CATERPILLAR...
2014 Doyle Dry Fertilizer Tender Trailer - Kubota Diesel, 3 Stainless Compartments, Side Discharge (A57024)
2014 Doyle Dry...
 
Top