Suggestions needed - How to deal with roots.

   / Suggestions needed - How to deal with roots. #11  
Hi Luke'sScreenName - The shed will take up about 1/4 of the area cleared, so the rest will be driveway, for lack of a better term. The roots are preventing me from grading the surface, that's all. i'm not worried about them under or near the new foundation, since the base of the shed will be raised for air flow. I could just leave them in place, but would rather be able to smooth out the area.

Thanks,
Dan

Understand. I think you need a ground engagement tool like a box blade with rippers. Alternatively, a pick maddock would work too :D
 

Tractor & Equipment Auctions

2003 International 7400 T/A Heil 12 CuYd Dump Truck (A55853)
2003 International...
Michelin CARGOXBIB High Floatation Tires (SET OF 6) (A55315)
Michelin CARGOXBIB...
UNUSED FUTURE 40" HYD TILTING BUCKET (A52706)
UNUSED FUTURE 40"...
206320 (A57192)
206320 (A57192)
2002 International 9200i Truck (A55315)
2002 International...
2010 Toro Workman MD (A55973)
2010 Toro Workman...
 
Top