Suggestions needed - How to deal with roots.

   / Suggestions needed - How to deal with roots. #11  
Hi Luke'sScreenName - The shed will take up about 1/4 of the area cleared, so the rest will be driveway, for lack of a better term. The roots are preventing me from grading the surface, that's all. i'm not worried about them under or near the new foundation, since the base of the shed will be raised for air flow. I could just leave them in place, but would rather be able to smooth out the area.

Thanks,
Dan

Understand. I think you need a ground engagement tool like a box blade with rippers. Alternatively, a pick maddock would work too :D
 

Tractor & Equipment Auctions

2016 Chevrolet Express 2500 Passenger Van (A55973)
2016 Chevrolet...
2007 Heil Heavy Duty Aluminum Tank Trailer (A56435)
2007 Heil Heavy...
Rooster Wooden Statue (A55853)
Rooster Wooden...
2021 John Deere 333G Compact Track Loader, 390 Hours, High Flow Hydraulics, Ride Control (A56435)
2021 John Deere...
2012 Chevrolet Express 3500 Passenger Van (A55973)
2012 Chevrolet...
2020 MACK GRANITE (A58214)
2020 MACK GRANITE...
 
Top