farmer2009
Elite Member
One question about your service feed. Are you sure it's a 400amp feed?
Here 400amp requires 2-3" conduits and a non-bypass meter. Then the power company feeds 6 wires not 3. Your side of the meter is wired true 400. But the power company here calls what you have 320 amp service. As its a single feed with a bypass meter. (The red handle).
Here 400amp requires 2-3" conduits and a non-bypass meter. Then the power company feeds 6 wires not 3. Your side of the meter is wired true 400. But the power company here calls what you have 320 amp service. As its a single feed with a bypass meter. (The red handle).