Here is a project I worked on this afternoon, I have already installed a new pipeline for irrigation and need to laser level this field.

So I started tilling at 3:45 pm and ended at 6:50 pm. This included a few minutes for a break and refueling, so 4.2 acres in 3 hours. Travel speed was 2.6 mph and the tiller blades are worn but still good enough for the initial passes.

Notice how tall the grass and weeds are because I had no issues with wrapping, higher than the tractor hood in places. Next week I will make another pass
 

Attachments

  • 20170822_190119.jpg
    20170822_190119.jpg
    4.2 MB · Views: 130
  • 20170822_190115.jpg
    20170822_190115.jpg
    4.3 MB · Views: 118
  • 20170822_173820.jpg
    20170822_173820.jpg
    6 MB · Views: 129
/ Rototilling #22  
I would charge by the hour. $75-$100 is about right. Let the customer decide when it looks like what they want. No danger in underbidding the job if you set the hourly rate right.
 

Marketplace Items

Wolverine 72� Skid Steer Screening Bucket (A64047)
Wolverine 72�...
2025 Swict 84in Bucket Skid Steer Attachment (A61572)
2025 Swict 84in...
2009 FORD F-750 XL SUPER DUTY DUMP TRUCK (A63276)
2009 FORD F-750 XL...
2015 Komatsu PC360LC-11 Excavator (A64047)
2015 Komatsu...
Engine (A59228)
Engine (A59228)
iDrive TDS-2010H ProJack M2 Electric Trailer Dolly (A59228)
iDrive TDS-2010H...
 
Top