Rototilling

   / Rototilling #21  
Here is a project I worked on this afternoon, I have already installed a new pipeline for irrigation and need to laser level this field.

So I started tilling at 3:45 pm and ended at 6:50 pm. This included a few minutes for a break and refueling, so 4.2 acres in 3 hours. Travel speed was 2.6 mph and the tiller blades are worn but still good enough for the initial passes.

Notice how tall the grass and weeds are because I had no issues with wrapping, higher than the tractor hood in places. Next week I will make another pass
 

Attachments

  • 20170822_190119.jpg
    20170822_190119.jpg
    4.2 MB · Views: 125
  • 20170822_190115.jpg
    20170822_190115.jpg
    4.3 MB · Views: 111
  • 20170822_173820.jpg
    20170822_173820.jpg
    6 MB · Views: 123
   / Rototilling #22  
I would charge by the hour. $75-$100 is about right. Let the customer decide when it looks like what they want. No danger in underbidding the job if you set the hourly rate right.
 

Tractor & Equipment Auctions

2012 Ram 3500 Crew Cab Flat Bed Truck (A56858)
2012 Ram 3500 Crew...
2020 DRAGON ESP 150BBL ALUMINUM (A58214)
2020 DRAGON ESP...
SDLD25 MINI DUMPER (A58214)
SDLD25 MINI DUMPER...
2017 Ford Explorer SUV (A56859)
2017 Ford Explorer...
EZ-GO Utility Cart (A55853)
EZ-GO Utility Cart...
2018 Freightliner Bucket Truck (A55973)
2018 Freightliner...
 
Top