Rock Jaw?

   / Rock Jaw?
  • Thread Starter
#3  
   / Rock Jaw? #4  
Nice work! Do have the measurements for above and below the pivot point? That would be much appreciated.
I'm in a similar situation- lots of rock to move! Plus some of mine is down a steep hill and it would be impossible to lift it up with a grapple of forks.

If you will reply again tomorrow that will remind me to go out and measure them.
 
   / Rock Jaw? #5  
Luke - and as I remember you were able to move some pretty big rocks.
 
   / Rock Jaw?
  • Thread Starter
#7  
   / Rock Jaw?
  • Thread Starter
#9  
Thank you! Looks like 9" above the pivot point and 28" below. I'm assuming the ratio is important but the scale can change?
 
   / Rock Jaw? #10  
No mathematics involved in my design. I actually doubt the ratio matters much as long as it is above a certain point (above the pivot is long enough). Longer just makes them harder to open while hanging.

Also the length of the chain connecting the sides should be as short as possible.

If I were making them to be put on laying on their side (rather than lifting straight up), I would have four legs rather than 3.
 
 

Tractor & Equipment Auctions

1273 (A50490)
1273 (A50490)
2010 International 4400 National Crane 300C Crane Truck (A50323)
2010 International...
66in Light Material Bucket Skid Steer Connection (A51039)
66in Light...
2007 MACK GRANITE ROLL OFF TRUCK (A51222)
2007 MACK GRANITE...
2016 KBH Fertilizer Tender Trailer - Isuzu Diesel, Hydraulic System, Rear Discharge (A51039)
2016 KBH...
2018 CATERPILLAR 308E2 CR EXCAVATOR (A50458)
2018 CATERPILLAR...
 
Top