I have purchased a new 30x40 pole shed and found a guy to do the site fill and compaction and do the concrete work after the pole shed is built (I like that one guy is responsible for this work...no excuses for not doing it right). The way the building is put up....he will use the lower boards for the concrete forms....which is a common practice around here. He is putting in 1/2" rebar on a 3' grid....and a six-bag mix. But....I forgot to talk with him about putting down a vapor barrier under the concrete slab. I spent considerable time getting a good tight building with decent sidewall soffits and ridge venting to reduce problems with condensation.....but I forgot all about the under floor barrier.
What are some thoughts? Is a vapor barrier needed under the concrete or not? How much extra should I pay to have my concrete & fill guy install the vapor barrier?
What are some thoughts? Is a vapor barrier needed under the concrete or not? How much extra should I pay to have my concrete & fill guy install the vapor barrier?