Have a (new) barn that I plan on putting concrete down.
I will have 5" of concrete with 1/2" rebar spaced 18" and 1/2" or 3/4" pex ran along the rebar for heating the area.. Should I try and put a floor drain in or just let any water evaporate. Seems like adding a drain while running the pex would add to the complexity of the thing.
Wedge
I will have 5" of concrete with 1/2" rebar spaced 18" and 1/2" or 3/4" pex ran along the rebar for heating the area.. Should I try and put a floor drain in or just let any water evaporate. Seems like adding a drain while running the pex would add to the complexity of the thing.
Wedge