Pat's Easy Change Ordered

/ Pat's Easy Change Ordered #1  

RSKY

Elite Member
Joined
Oct 5, 2003
Messages
2,866
Location
Kentucky, West of the Lakes, South of Possum Trot.
Tractor
Kioti CK20S
Finally ordered my Pat's Easy Change. Shopped online and found the best price to be from Rural King. Easy Change with spreader bar and three extra sets of washers was $181.96 plus $10.92 tax for a total of $192.88. No shipping charge! It has already shipped and should be here tomorrow or Monday. I will let everybody know how ordering from Rural King works out.

RSKY
 
/ Pat's Easy Change Ordered #2  
Just started using mine.
So far, so good.....and makes hooking up so easy.

One learning curve: My post hole digger (PHD) is Cat 1 (can't change welded pins) and the PAT's are CAT 2. No problem says I, just add a conversion bushing to the PHD pins, now they're Cat 2 and off I went.
The PHD in rocky ground(!) was a good test for Pats.... BUT I forgot and used the CAT 2 "special 1/2 washers" that came with the Pat's, that protect the retaining clip that goes through the PHD's pins. What I didn't notice is there's just enough slop in those washers on the Cat 1 pin that when the PHD finds a rock and bangs around, the washer can sneak past the bottom of the retaining clip and unlock the clip and send it flying. :eek: Now I'm watching a rotating post hole digger banging around in a hole & it's only hanging to the tractor is by the top link and the PTO. This 1 point hitch doesn't work well!

I went and bought some "full circle" washers with a 7/8" opening (Cat 1) and used them and no problems.
 
/ Pat's Easy Change Ordered #3  
Finally ordered my Pat's Easy Change. Shopped online and found the best price to be from Rural King. Easy Change with spreader bar and three extra sets of washers was $181.96 plus $10.92 tax for a total of $192.88. No shipping charge! It has already shipped and should be here tomorrow or Monday. I will let everybody know how ordering from Rural King works out.

RSKY
Pat's Easy Change is $169.99 from Agri Supply.
No Tax,..... but there is a shipping cost.
Agri Supply is a FIRST CLASS COMPANY to deal with!
 
/ Pat's Easy Change Ordered #4  
I have a set of Pat's QH, but I have been using my H.F. Q.H. for so long, I decided to go back to that. I have the Pat's on Craig'sList for $125. No bites yet. I should use Ebay, but I hate the monthly fee they charge.
 
/ Pat's Easy Change Ordered #5  
Do yourself a favor and buy some grade 8 bolts to replace the ones they ship with, they are super cheap and can bend. mine bent and they shipped me gold color grade 8 which are so much stronger. The manufacturer has awesome customer service but using a stronger bolt would prevent things. The easy change system rocks.
 
/ Pat's Easy Change Ordered #6  
I have a set of Pat's QH, but I have been using my H.F. Q.H. for so long, I decided to go back to that. I have the Pat's on Craig'sList for $125. No bites yet. I should use Ebay, but I hate the monthly fee they charge.

Since when has E-Bay been charging a "monthly fee"?
 
/ Pat's Easy Change Ordered #7  
Do yourself a favor and buy some grade 8 bolts to replace the ones they ship with, they are super cheap and can bend. mine bent and they shipped me gold color grade 8 which are so much stronger. The manufacturer has awesome customer service but using a stronger bolt would prevent things. The easy change system rocks.

Grade 5 bolts should work just fine also.
 
/ Pat's Easy Change Ordered
  • Thread Starter
#8  
Pat's Easy Change is $169.99 from Agri Supply.
No Tax,..... but there is a shipping cost.
Agri Supply is a FIRST CLASS COMPANY to deal with!

The Rural King total delivered was $192.88. Agri Supply did not have free shipping. When all was totaled up they would have been $204.77. Or nearly twelve dollars higher for the same thing. So I went with Rural King.

RSKY
 
/ Pat's Easy Change Ordered #9  
Mine worked fine with a bush hog planter, disc, tiller etc but didn't work well with a box blade that's when the bolts bent. Just a suggestion
 
/ Pat's Easy Change Ordered #10  
Do yourself a favor and buy some grade 8 bolts to replace the ones they ship with, they are super cheap and can bend. mine bent and they shipped me gold color grade 8 which are so much stronger. The manufacturer has awesome customer service but using a stronger bolt would prevent things. The easy change system rocks.
I'm not very familiar with Pat's easy change system but one might be careful not to use too strong a bolt causing a more expensive failure if it doesn't bend/shear.
 
/ Pat's Easy Change Ordered #11  
I'm not very familiar with Pat's easy change system but one might be careful not to use too strong a bolt causing a more expensive failure if it doesn't bend/shear.

The other damage that would occur would be that it strips the threads out of the Pat's hitches. Then I guess it would be time for larger bolts.
 
/ Pat's Easy Change Ordered #12  
Pat's Easy Change is $169.99 from Agri Supply.
No Tax,..... but there is a shipping cost.
Agri Supply is a FIRST CLASS COMPANY to deal with!

That's where I got mine. They include the drag link in the price where some other suppliers charge you about $18 more for it. Without the link you loose half the advantage of the system.
 
/ Pat's Easy Change Ordered #13  
That's where I got mine. They include the drag link in the price where some other suppliers charge you about $18 more for it. Without the link you loose half the advantage of the system.

Unless you have telescoping stabilizers.
 
 

Marketplace Items

2016 Ford Taurus Sedan (A61574)
2016 Ford Taurus...
2019 CAT 259D (A60462)
2019 CAT 259D (A60462)
2010 International 4300 Truck Altec DM47TR Insulated Material Handling Digger Derrick Truck (A64194)
2010 International...
2019 Jayco Octane T32H Toy Hauler (A62613)
2019 Jayco Octane...
Ford Pickup Truck Bed (A61573)
Ford Pickup Truck...
UNUSED SDLANCH 25'X33' METAL SHED (A64281)
UNUSED SDLANCH...
 
Top