scdeerslayer
Gold Member
I'm not very familiar with Pat's easy change system but one might be careful not to use too strong a bolt causing a more expensive failure if it doesn't bend/shear.
The other damage that would occur would be that it strips the threads out of the Pat's hitches. Then I guess it would be time for larger bolts.