New Project - What Would You Have Done Differently?

   / New Project - What Would You Have Done Differently? #11  
Rory_Rhodes said:
So, now my question for the metal building;

What quick advice would you have - besides hiring a licensed electrician for the job - to plan this empty space out before I start moving equipment?

I will also have a Kubota L3130 w/backhoe, an RTV, and soon a SkidSteer to store in this unit.

My shop is much smaller but all my 110 Electric outlets are about 4 foot off the floor and there are two circuits for the outlets, every other outlet is on the alternate circuit, helps me keep from overloading a circuit with too many tools operating at the same time, the outlets are brown on one circuit, ivory on the other as a further reminder- the dust collector is on a separate 220V circuit. Good luck with the shop, would love to have that kind of space!
 

Tractor & Equipment Auctions

2013 East Manufacturing 45ft T/A Walking Floor Trailer (A53422)
2013 East...
2016 JOHN DEERE 624K WHEEL LOADER (A51246)
2016 JOHN DEERE...
UNUSED (2) 3500# DROP AXLE W/ BRAKES (A54756)
UNUSED (2) 3500#...
2016 Ford F-450 12FT Flatbed Truck (A51692)
2016 Ford F-450...
UNUSED WOLVERINE PFF1-13-45W PALLET FORK FRAME (A54757)
UNUSED WOLVERINE...
2020 CATERPILLAR 259D3 SKID STEER (A52705)
2020 CATERPILLAR...
 
Top