New Project - What Would You Have Done Differently?

   / New Project - What Would You Have Done Differently? #11  
Rory_Rhodes said:
So, now my question for the metal building;

What quick advice would you have - besides hiring a licensed electrician for the job - to plan this empty space out before I start moving equipment?

I will also have a Kubota L3130 w/backhoe, an RTV, and soon a SkidSteer to store in this unit.

My shop is much smaller but all my 110 Electric outlets are about 4 foot off the floor and there are two circuits for the outlets, every other outlet is on the alternate circuit, helps me keep from overloading a circuit with too many tools operating at the same time, the outlets are brown on one circuit, ivory on the other as a further reminder- the dust collector is on a separate 220V circuit. Good luck with the shop, would love to have that kind of space!
 

Tractor & Equipment Auctions

2012 PETERBILT 388 DAYCAB (A53843)
2012 PETERBILT 388...
2015 Chevrolet Silverado 2500 HD Crew Cab Pickup Truck (A55788)
2015 Chevrolet...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
2018 INTERNATIONAL 4400 4X2 EXT CAB SERVICE TRUCK (A51406)
2018 INTERNATIONAL...
2007 Ford E-450 Super Duty 16ft Portable Office Truck (A51692)
2007 Ford E-450...
Miller Spectrum 500 DC Plasma Cutting System (A55851)
Miller Spectrum...
 
Top